Guest mode. You can read posts without signing up. Comments, ratings, job contacts and your own posts open after you sign up and accept the rules. What is Kommit →

Редакция КоммитРедакция портала
commit 6625515 · 19 days ago

1C: Reports on ACS, Part 1: Layout Scheme — Data Sets, Resources, Parameters, and Options

🌐 Machine-translated from Russian. Show original

In this part:

Why ACS#

The data layout system provides the user with report settings without a programmer: selections, groupings, sorting, conditional formatting, charts. The programmer describes which data and how to link it, and how to display it is configured in variants.

Datasets#

  • The query is the main option. In the query, describe the data, not the formatting.
  • Merging — multiple queries into one table.
  • Object — data prepared by code (value table) when the query cannot retrieve it.

Fields that the user can select and group must be set fields with clear headers.

Resources#

Resources — what is summed in groupings: quantity, sum, revenue. Functions: sum, quantity, minimum, maximum, average. For calculated metrics (markup in percentages), use calculated fields and resource expressions, not calculation in each row.

Parameters#

  • Report period — the StartPeriod and EndPeriod parameters related to virtual table parameters in the query (this is faster than selecting after the table — see query acceleration).
  • Make basic settings quick settings — the user sees them immediately on the report form.

Report options#

One report — several options: "Revenue by month," "Revenue by managers," "Detailed by documents." The user chooses an option instead of requesting a new report.

Conditional formatting#

Highlighting negative balances in red, overdue receivables in bold. Set in the option settings, without code.

Performance#

  • Do not select extra fields in the query or connect to unnecessary tables — the DCS optimizes the query, but not magically.
  • Validate the report on the actual data volume and under the user with access restrictions.

Next comes BSP and embedding reports.

Comments 00 участников · 0 гостей🔒 Rate and discuss after signing up

Comments · 0

No comments yet.Sign in to comment, rate and see all comments.