Guest mode. You can read posts without signing up. Comments, ratings, job contacts and your own posts open after you sign up and accept the rules. What is Kommit →

Редакция КоммитРедакция портала
commit e389d4e · 15 days ago

Helpdesk, Part 5: SLA, categories, knowledge base, and reports in GLPI — how to measure support performance

🌐 Machine-translated from Russian. Show original

In this part:

Step 1. Work calendar#

SLAs are counted in working hours, so the calendar comes first.

Configuring → Drop-down lists → Calendars → Add — Office 9–18:

  • Time slots: Monday–Friday, 09:00–18:00 (lunch breaks can be excluded with separate intervals).
  • Holidays — add holidays and RK transfers for the current year. The list changes annually (government decree on weekend transfers) — create a reminder to update the calendar in December.

For 24/7 services (ticket offices, website) — a second calendar is "24/7."

Step 2. Application categories#

Setting → Dropdown lists → Application categories. Rule — 10–20 categories in two levels, not a hundred:

CategorySubcategoriesDefault Group
Workplacecomputer, laptop, monitor, peripherals,first line
Printingprinter, MFPs, cartridges,1st line
Accounts and accesspassword, folder access, new employee, dismissal,1st line
1Cerror, revision, rights, exchange,1C group
Mail and communicationsmail, telephony, messengers,1st line
Network and internetno internet, Wi-Fi, VPN,network group
Servers and servicesfile server, website, backups,2nd line
Procurement and issuance of equipment—1st line

In the category card, mark its purpose: incident, request , or both, and specify the group and application template. For queries of the "new employee" type, a template with mandatory fields (full name, department, release date, accesses) will eliminate correspondence.

Step 3. Service levels: SLA and escalations#

Configuring → Service levels → Add — "Office Standard," calendar "Office 9–18." Inside, create two types of SLAs:

SLATypeTerm
P2 — responsetime to work (TTO)30 minutes
P2 — solutiontime to solution (TTR)8 hours
P3 — reactionTTO2 hours
P3 — decisionTTR2 business days
………

For P1 — a separate service level with a 24/7 calendar if you are on call.

Escalations — inside the SLA is a tab of escalation levels: for example, "1 hour before TTR violation → notify the group leader," "after violation → appoint the IT manager as an observer." They trigger through automatic action slaticket — which is why cron from Helpdesk is so important, part 3: installing GLPI 12 on Ubuntu 24.04 — PHP 8.3, MariaDB, HTTPS, cron, and collecting requests from mail — configure it according to the table from Helpdesk, part 1: why support and ITIL is needed without bureaucracy — incidents, requests, priorities, and SLA.

Step 4. Knowledge base#

Tools → Knowledge Base. In GLPI 12, the knowledge base is completely rewritten:

  • Categories no longer exist — their role is played by "parent" articles, to which the child articles are linked; when updated from 11.x, categories become such articles.
  • Visibility is inherited down the tree: closed the "For IT" section — all articles inside are closed.

⚠️ When upgrading from GLPI 11, former categories are hidden until you explicitly grant access to them — check visibility immediately after the update.

How to fill so the base doesn't die:

  • Each repeated application → an article. We solved the same thing a second time — write instructions (there is a button from the application to save the solution to the knowledge base).
  • Two classrooms: for users ("How to connect to Wi-Fi guests," "How to set up email on your phone") and an internal IT audience ("Restarting exchange with bank," "Where 1C backups lie").
  • Article structure: problem → who is suitable → steps with screenshots → what to do if it didn't help.
  • Once a quarter — revision: outdated ones are removed.

We don't write passwords and keys to the knowledge base — that's what the password manager is for.

Step 5. Reports and KPIs#

Built-in:

  • Help → Statistics — requests by performers, groups, categories, average reaction and decision times, satisfaction.
  • Dashboards on the main page — cards and charts: open requests, overdue SLAs, categorization. You can assemble your own dashboard and show it to your manager.
  • Satisfaction surveys (Entity → Administration → "Satisfaction Surveys" tab) — after closing the ticket, the user receives a score of 1–5.

Which metrics to look at#

MetricWhat theBenchmark
Applications for the period, by categoriesload and "pain points"trend, not the number of
% SLA execution (reaction and decision)whether we keep the promise90–95%
Average and median decision timespeedby priority separately
Decision on first appeal (FCR)first-line quality60–70% for typical
Reopened applicationssolution quality< 5%
Satisfaction (CSAT)user view4.5 out of 5
The age of open applications (backlog)what is "frozen"no applications older than 30 days without reason
Top 10 Recurring ProblemsCandidates to Eliminate the CauseAnalyze Monthly

How to choose KPIs for the IT department as a whole and not turn them into "reports for the sake of reports" — see the editorial article "KPIs for the IT department: what to measure to improve performance, not reports."

💡 You need your own charts — create a read-only user in MariaDB for the GLPI database and connect it as a source in Grafana (see the series "Monitoring: Zabbix, Prometheus, and Grafana"). Table structure changes between versions — check queries after updates.

Monthly ritual#

  1. Report: applications, % SLA, CSAT, backlog.
  2. Top 5 categories → what can be automated or closed with an article.
  3. Repeated incidents → cause a problem and find the cause.
  4. Review SLA if it is not running systematically (or running with a huge margin).
  5. Show the manager one page with numbers and conclusions.

Part 5 checklist#

  • Calendar of holidays in the Republic of Kazakhstan for the current year
  • 10–20 categories, each with a group and type (incident/request)
  • SLA to response and decision by priority, escalation
  • Business rules automatically assign SLA and group
  • Knowledge base: the first 20 articles for users and IT
  • Satisfaction survey and monthly report

The last part — remote help and integrations: Helpdesk, part 6: remote support and integrations — WorkDesk, messengers, AD, and routine automation.

Comments 00 участников · 2 гостя🔒 Rate and discuss after signing up

Comments · 0

No comments yet.Sign in to comment, rate and see all comments.