Terms of Reference Template for an IT Project: Sections, Examples, and Common Mistakes
🌐 Machine-translated from Russian. Show original
A good technical specification saves months of revisions. A bad one is either empty ("make it convenient") or 200 pages long that no one reads. Below is a template that works for most projects: websites, integrations, 1C improvements, internal systems.
In this part:
1. Purpose and Context#
- Why the project: what business problem are we solving. "Managers spend 2 hours a day manually transferring orders from the website to 1C."
- Once we understand that the goal has been achieved: measurable. "Orders arrive in 1C automatically within 5 minutes, no manual transfer needed."
- What is outside the project framework is just as important as what's within it.
2. Users and roles#
| Role of | What does it do in the | system
| --- | --- |
| The sales manager | sees orders, changes statuses, |
| The storekeeper | gathers orders, marks shipments, |
| Administrator | manages directories and users |
3. Scenarios#
Describe the operation through the eyes of the user, step by step:
Scenario: new order from the website. The buyer places an order → the order appears in 1C with the status "New" → the manager receives a notification → the manager confirms the order → the goods are reserved.
Separately — exceptions: the product is out of stock, the buyer canceled the order, the website is unavailable.
4. Functional requirements#
Number the requirements — they will be referenced in tasks and acceptance:
- FT-1. An order from the website is created in 1C no later than 5 minutes later.
- FT-2. If there is no product, the order receives the status "Requires attention."
- FT-3. The manager sees the history of order status changes.
5. Non-functional requirements#
- Performance: how many users, data, and response time.
- Reliability: what happens during communication failure, duplicates, queues.
- Security: roles and rights, personal data, logging.
- Compatibility: browsers, 1C versions, mobile devices.
6. Integrations and data#
- Which systems participate, who owns each.
- Exchange format (API, files), frequency, who initiates.
- Field correspondence: table "field on the website → 1C requisite".
- What about existing data: migration, cleanup, bootloading.
7. Acceptance Criteria#
For each key requirement — how to check:
FT-1. Place a test order on the website → in 5 minutes it is available in 1C with the same composition and amount.
Without acceptance criteria, project delivery turns into a dispute.
8. Stages and Deadlines#
Break it into stages with a result that can be shown: prototype, first integration, pilot in one department, launch. Estimate deadlines according to the methodology from the post "How to Evaluate IT Projects."
Typical mistakes#
- "To do it conveniently and quickly" is immeasurable. What does quick mean: a second or a minute?
- Solution instead of task: "add button" instead of "manager needs to confirm the order in one step."
- There are no exceptions — 80% of startup problems occur in unforeseen situations.
- The Terms of Reference is not agreed upon with those who will use the system.
💬 Need a template in document form? Write in the comments — we'll prepare it.