
🌐 Machine-translated from Russian. Show original
Exchange 2016 and 2019 were left without security updates, and for many Russian companies, even without licenses and support. Let's figure out how to switch to a domestic mail server so that users don't lose emails, calendars, shared inboxes, and the familiar Outlook.
i️ Terms are changing. Prices, rates, and features are as of November 2026. Before purchasing or implementing, please check the official websites.
In this part:
Why you can't put it off anymore
According to Microsoft Lifecycle, extended support for Exchange Server 2016 and 2019 ended on October 14, 2025. The server will continue to operate, but new vulnerabilities will not be closed. Microsoft's official path is Exchange Server Subscription Edition, but for organizations that must or want to migrate to software from the registry, this is not an option.
Mail is the most noticeable service for users: if the manager's calendar or the general accounting inbox disappears after moving, the project will be remembered for a long time. Therefore, the main thing in migration is not the choice of product, but the mode of coexistence and neat transfer of group data.
What to choose from
Read more
🌐 Machine-translated from Russian. Show original
In this part:
What we carry
| Data | What is carried over |
|---|
| Emails and folders | IMAP synchronization (imapsync, cloud wizards) |
| Calendars | export/import ICS, CalDAV, Microsoft/Google wizards for "your" systems |
| Contacts | export/import vCard/CSV, CardDAV, |
| Shared mailboxes, distribution groups, | are created again manually or by scripting |
| Rules, signatures, delegation, | anew, according to the |
| Pseudonym addresses | renewed after exporting from the old system |
Important: IMAP transfers only mail. Calendars and contacts need to be transferred separately — set aside time for this.
Tools
| Tool | From → Where to | Features |
|---|
| IMAP migration to Microsoft 365 (Exchange admin center → Migration) | any IMAP → Microsoft 365 | emails only; up to 500,000 items per mailbox; email up to 35 MB; CSV with mailbox list |
| Hybrid migration Exchange | Exchange SE → Microsoft 365 | migrates everything, including calendars; Outlook does not need to be reconfigured |
| Google Workspace (Data Migration) Migration Wizard | Microsoft 365, Exchange, IMAP, → Workspace | mail, and for some sources — calendars and contacts |
| imapsync | any IMAP → any IMAP | a universal, multi-run start, transfers only the missing |
| Synchronization in Mailcow (Sync jobs) | external IMAP → Mailcow | built-in IMAPSYNC with configuration from the web panel |
imapsync
Read more
🌐 Machine-translated from Russian. Show original
In this part:
Processor
CPU model. host-passthrough gives the VM all host processor instructions — maximum speed. If VMs will migrate between different servers — use the common model (host-model or named one, for example EPYC, Skylake-Server).
Core binding (CPU pinning) for heavy VMs (DBMS, 1C):
lscpu -e # ядра, NUMA-узлы и потоки
virsh vcpupin db01 0 4
virsh vcpupin db01 1 5
virsh emulatorpin db01 0-1
To secure it permanently — the section <cputune> in virsh edit. Rules: keep the VM in one NUMA node, do not give it the cores on which the host runs, and do not share the "threads" of one kernel among different heavy VMs.
Memory
- Hugepages (2 MB or 1 GB pages) reduce overhead for large VMs:
echo 'vm.nr_hugepages = 8192' | sudo tee /etc/sysctl.d/90-hugepages.conf # 8192 × 2 МБ = 16 ГБ
sudo sysctl --system
<memoryBacking><hugepages/></memoryBacking>
- Ballooning allows the host to take unused memory from the VM — convenient for test benches but not for databases.
- KSM (Identical Page Merging) saves memory for many identical VMs but consumes the processor and theoretically opens attacks through third-party channels — enable it consciously.
Discs
virtio-scsi instead of virtio-blk — if you need many drives and TRIM.
- IOThreads offload the main VM flow during intensive input-output:
Read more
🌐 Machine-translated from Russian. Show original
In this part:
Setting the role
Install-WindowsFeature Hyper-V -IncludeManagementTools -Restart
Do not overload the Hyper-V host with other roles: only virtualization and, if necessary, a backup agent.
Virtual switches
- External — VM in the local network via a physical adapter.
- Internal — the connection between the VM and the host.
- Private — only between VMs.
New-VMSwitch -Name "LAN" -NetAdapterName "Ethernet" -AllowManagementOS $true
The VLAN tag is set in the VM network adapter settings.
Creating a VM
New-VM -Name "SRV1C" -Generation 2 -MemoryStartupBytes 16GB -SwitchName "LAN" `
-NewVHDPath "D:\VMs\SRV1C\disk0.vhdx" -NewVHDSizeBytes 200GB
Set-VMProcessor -VMName "SRV1C" -Count 8
- Generation 2 — UEFI and secure boot for modern operating systems.
- The drives are VHDX, and for DBMSs — fixed size.
- Dynamic memory — for applications, but not for DBMSs and 1C servers with large caches.
- Enable integration services in the guest OS.
Checkpoints and backups
- Production checkpoints use shadow copying inside the guest — consistent application state. Like snapshots in Proxmox, this is not a replacement for backup.
- VM backups — using Windows Server Backup or specialized backup products for Hyper-V, with storage of copies outside the host.
Physical server migration to VM (P2V)
Read more
🌐 Machine-translated from Russian. Show original
In this part:
Step 1. Inventory
Create a table of all systems:
| System | Data | Dependencies | Criticality | Method of |
|---|
| 1C | employee PD, accounting | DBMS, licenses, exchanges, | high | new VM + database transfer |
| Website | public | databases, mail, | medium | containers, |
| File server | documents | AD | medium | synchronization |
Be sure to mark hardware and network links: licenses, USB keys, fixed IP with partners, exchanges with banks and government systems.
Step 2. Architecture in the cloud
- Network: private server network, VPN with office (WireGuard or MikroTik).
- Security: access to management is only via VPN, public is only what should be public.
- Backups: with provider funds and their own, with a copy from another provider or in the office.
Step 3. Pilot
Start with a non-critical system: 1C test base, internal portal. Check performance, user latencies, backups and recovery, and real-time monthly costs.
Step 4. Wave transport
- Auxiliary services.
- Medium-severity systems.
- Key systems (1C, DBMS) — during off-hours, with rollback plans.
Switching without downtime
Read more