ACS, part 5: installation — cables, power, locks, turnstiles, and commissioning
🌐 Machine-translated from Russian. Show original
In this part:
Cable part#
| Line | Cable | Limitations |
|---|---|---|
| Reader → controller (Wiegand) | a multi-core signal cable, better shielded | usually up to 100–150 m, more precisely according to |
| Controller → controller (RS-485, OSDP) | twisted pair | up to 1200 m according to line |
| Controller → network | twisted pair Cat5e/6 | up to 100 m to switch |
| Power supply to the lock | cable by the lock current and line length | consider voltage drop |
- Signal lines are separate from power lines.
- Cables in the door and door frame — through the cable junction (flexible transition), otherwise they will wear out.
- Marking each cable on both sides and a cable log.
Diet#
- The power supply with battery is calculated based on the sum of currents: controller + readers + locks (the electromagnetic lock has constant current while the door is closed).
- Battery life depends on the site's requirements (often several hours).
- Separate power supply for the locks and electronics — interference from the locks does not knock down the controller.
Installing locks#
- The electromagnetic lock is placed on the door frame, the counter bar on the door; the surfaces must fit tightly, otherwise the holding force drops sharply.
- Electromechanical cuts into the door; check compatibility with the thickness and material of the door.
- A close close is mandatory — without it, the door does not close completely.
- The door opening sensor allows you to track "door is held open" and break-in.
Turnstiles#
- Foundation or strong base, anchor fastening according to documentation.
- Cables to the turnstile are in embedded pipes in the floor; plan them before finishing.
- Evacuation routes: next to turnstiles — a gate or passage, unlocked by fire alarms and manually by a security post.
- The readers are at a comfortable height, with clear input/output input.
Commissioning#
- Check the voltage levels on each device under load.
- Firmware updates for controllers and readers.
- Changing device and software factory passwords.
- Configuring doors, access levels, and schedules.
- Test of each door: entry by card, refusal by someone else's card, exit by button, door open alarm, battery operation.
- Fire unblocking test together with the fire safety officer — with an entry in the report.
- Training administrators and operators, transferring the system passport and passwords to the customer.
As-built documentation#
A plan with device locations, wiring diagrams, cable log, IP address list, logins (in secure storage), test report. Without this, the next contractor will start by "checking" the entire site.
Next — operation.